EB EstimateBDDesign · Estimate · Survey
LGED · RHD · PWD schedule-accurate

Road and building estimates, done properly — in days, not weeks.

Design, detailed estimate, BOQ and rate analysis, earthwork volume and topographic survey for government and private civil works across Bangladesh. Prepared by practising engineers against the current schedule of rates.

3–7working days typical delivery
100%current schedule of rates
4in-house software systems
bKashNagad · bank transfer accepted

Professional Services

What we deliver

Every job is returned as an editable file plus a signed PDF — so you can submit it, defend it, and revise it yourself.

🛣

Road Design & Estimate

Alignment, typical cross-section, pavement design, detailed quantity take-off and estimate for RCC, bitumen carpeting, HBB and WBM roads. Includes cross-drainage.

From Tk 8,000 per km · 5 days
🏫

Building & School House Design

Architectural and structural drawings, RCC detailing, full quantity take-off and estimate for school buildings, community clinics, offices and residential works.

From Tk 12 per sft · 7 days
📋

BOQ & Rate Analysis

Item-wise Bill of Quantities with rate analysis traced to the current LGED/RHD/PWD schedule. Tender-ready, with basis of every derived rate shown.

From Tk 5,000 per package · 3 days
⛰

Earthwork Volume Calculation

Cut and fill volumes from cross-section or grid levels, mass-haul diagram, and borrow/disposal summary — produced by our own volume calculation system.

From Tk 3,500 per km · 2 days
📐

Topographic & Land Survey

Total station and GPS survey, level book, contour map, longitudinal and cross-section drawings, plot demarcation and area calculation.

From Tk 6,000 per acre · 4 days
🗂

Road Data Management

Road inventory and condition database, chainage-wise asset register, and maintenance prioritisation reports built on our road data management system.

Quoted per network · consultation

Instant Estimate

Know the price before you call

Enter your job below. The figure is an indicative professional fee — the final quotation is confirmed after we see your drawings or survey data.

Indicative professional fee

Rates are configurable — edit the RATES object at the bottom of this file to match your own pricing. Government tender work over Tk 100,000 is quoted individually.

Pricing

Rate card & subscription plans

Indicative fees for common job sizes. Use the calculator above for your exact job — subscription plan details are further down the page.

ServiceUnit rateMinimumDelivery

Software subscription — see full plan details below ↓

For Engineers

Or run the estimates yourself

The same four systems we use in-house, licensed to engineers, contractors and consultancy firms. Browser-based — nothing to install.

Free

Tk 0 /month
  • Earthwork volume calculator
  • Basic quantity take-off tools
  • Rate schedule lookup (read only)
  • Estimate & BOQ generation
  • Road data management
Start free
MOST POPULAR

Professional

Tk 800 /month
  • Everything in Free
  • Full estimate & BOQ generation
  • Live LGED/RHD/PWD rate schedule
  • Rate analysis with auto derivation
  • Excel & PDF export, your letterhead
Get Professional

Enterprise

Tk 6,000 /month
  • Everything in Professional
  • Road data management system
  • Project-wise database (multi-user)
  • Team accounts & approval workflow
  • Priority support & training
Talk to us

Government project-wise database management is on the roadmap for Enterprise — early customers get it at no extra cost.

Free · No Signup

Free estimate templates & drawings

Ready-made estimate sheets with the standard item list, units and built-in formulas — open in Excel, put in your own quantities and rates. Drawings are sent by email on request.

Estimate templates — download instantly

Standard drawings — request by email

📐

Floor Plan Set

Single-storey and two-storey residential floor plans with dimensions, door-window schedule and area statement.

DWG · PDF
🧱

Footing & Column Details

Isolated and combined footing details, column schedule, lap and development length, tie spacing.

DWG · PDF
🏗

Grade Beam & Slab Reinforcement

Grade beam section, floor slab top and bottom reinforcement layout, bar bending schedule format.

DWG · PDF
🛣

Road Typical Cross-Section

BC, RCC, HBB and WBM typical sections with crest width, side slope, shoulder and camber to LGED standard.

DWG · PDF
🌉

Bridge & Box Culvert Section

Box culvert and small girder bridge general arrangement, abutment, wing wall and deck reinforcement.

DWG · PDF
📋

Bar Bending Schedule Format

Blank BBS sheet with automatic weight calculation using d²/162, plus a worked example.

XLSX

Templates are generated in your browser and open directly in Excel. Drawing requests use the form at the bottom of this page — replace with your own file links or an email tool before going live.

Free Tool

Construction materials calculator

Cement, sand, aggregate, brick and steel quantities for concrete, brickwork, plaster and reinforcement — in the units used on Bangladeshi sites.

Assumptions: 1 cement bag = 50 kg = 1.25 cft · dry volume factor 1.54 for concrete and 1.27 for mortar · brick 9.5″×4.5″×2.75″ with 10 mm joint · steel weight = d²/162 kg per metre. Edit the CONST object in the file to change any of these.

Process

Four steps, no surprises

Same process whether you are an upazila engineer, a contractor or a private client.

Send your job

Drawings, survey data, site photos or just a description. WhatsApp, email or the form below.

Fixed quotation

Written scope, price and delivery date within 24 hours. 50% advance to start.

Preparation

Prepared against the current schedule, cross-checked by a second engineer before release.

Delivery & revision

Editable Excel/CAD plus signed PDF. Two rounds of revision included free.

What you receive

ServiceDeliverablesFormat
Road design & estimatePlan, L-section, cross-sections, quantity sheet, detailed estimate, BOQDWG · XLSX · PDF
Building designArchitectural & structural drawings, RCC detail, estimate, BOQDWG · XLSX · PDF
BOQ & rate analysisItem-wise BOQ, rate analysis sheet, schedule referenceXLSX · PDF
Earthwork volumeCut/fill table, mass-haul diagram, borrow & disposal summaryXLSX · PDF
SurveyLevel book, contour map, L-section & cross-sections, area statementDWG · XLSX · PDF

Start a Job

Send your requirement

Reply within one working day with a fixed quotation. No obligation.

Reply within one working day with a fixed quotation. Files can be sent by WhatsApp after we reply.

Join the Network

Work with us

We work with engineers, draftsmen and surveyors across Bangladesh on a job-by-job basis. No fixed hours, no office attendance — you take the jobs you have time for, we pay per completed job.

📊

Freelance Estimator

Prepare detailed estimates and BOQ against LGED/RHD/PWD schedule. Diploma or B.Sc in Civil, 2+ years of estimating experience.

Tk 2,000–8,000 per job
✏️

CAD Draftsman

Architectural and structural drawings, road plan and cross-sections in AutoCAD. Speed and drawing standard matter more than degrees.

Tk 1,500–6,000 per job
📍

Surveyor

Total station or GPS field survey, level book and point data. Your own instrument is an advantage but not required.

Tk 3,000–12,000 per job
🤝

District Representative

Bring in work from your district — offices, contractors, private clients. Commission on every job you introduce.

10–15% commission
🎥

Tutorial & Content Creator

Make estimating, AutoCAD and site tutorials in Bangla for our channel. Paid per published video or article.

Tk 1,000–4,000 per piece
🎓

Student Internship

Polytechnic and university students: learn real estimating on real jobs. Unpaid for the first month, paid work after.

Training + paid jobs after

Apply to join

One short form. We reply within three working days with a small paid test job.

We reply within three working days with a small paid test job.

Or just join the community

A free Facebook group and WhatsApp channel for civil engineers in Bangladesh — rate schedule updates, estimating questions, job posts. No selling.

Join Facebook Group WhatsApp Channel

Common questions

If yours is not here, ask on WhatsApp.

Which schedule of rates do you use?

The current LGED, RHD or PWD schedule applicable to your district and year, whichever governs your work. The schedule edition and page reference is printed on every rate analysis sheet, so it can be checked line by line.

Can you work from my own survey data?

Yes. Send level books, total station files, CSV point data or CAD drawings. If the data has gaps we will tell you exactly what is missing before quoting.

Is the estimate tender-acceptable?

The estimate and BOQ are prepared in the standard tender format with item codes matching the schedule. Final approval and signature remain with the responsible officer of your department.

How do I pay?

bKash, Nagad, or bank transfer. 50% advance, 50% on delivery. Money receipt provided; institutional billing available.

Do you keep my project data confidential?

Yes. Project files are not shared or reused, and a written non-disclosure undertaking is provided on request for tender-stage work.